HEAVY DUTY SHORING & FALSEWORK SYSTEMS

10K (4,536 kg)/Leg Equipment

HL-10 Kip/Leg Frames
HL-10 Kip Accessories
HL-10 Kip Accessories

A World Class favorite for many decades, this system has an outstanding proven track record. With the use of four fixed height Frames, Coupling Pins, and a large variety of Cross Braces, infinite shoring conditions may be easily achieved in a safe, efficient, economical way.

Standard width Frames are 4'-0" (1.22 mm) and 2'-0" (0.61 m) wide, plus a complete series of Adjustment Screws and Staffs for fine grading are available.

For more information, click here to contact us.

 

 

Changes in elevations of undersides of concrete slabs is quite easy when using SCI's Aluminum Stringers and Aluminum Joists and 10K(4,536 kg)/Leg heavy duty falsework towers. Notice the convenience of the ability of the Aluminum Stringers to bypass within the U-heads of the falsework towers; as the base width of these Aluminum Stringers is 4" (101.6 mm).

 

 

 

10K (4,536 kg)/Leg Frames & Accessories
SCI Aluminum Stringers
SCI Aluminum Joists
Note the clear unobstructed open work area below the slab form equipment

 

 

 

SCI's 10KLeg (4,536kg) Falsework Equipment, SCI's 6.5" (165mm) Aluminum Joists & SCI's Custom Engineered Trusses were used to form this very difficult cast-in-place reinforced concrete stair structure at a Metro North commuter railroad station in the Northeast United States. It was very critical that no element of the formwork/ falsework system extended beyond the edge of the station platform into the active track area. SCI also designed & furnished all of the concrete accessories, architectural feature strips, etc.

 