HEAVY DUTY FALSEWORK SYSTEMS

25K (11,340 kg) Wall or Column Mounted Bracket.

Interior Wall or Column Installation
Installation with Adjustable Extension Bracket

 

A custom engineered and manufactured Flying Formwork System utilizing lightweight steel trusses supported on column mounted adjustable jacks on this high rise condominium building.

 

 

 

Custom FRP Gang Forms designed and furnished by SCI for this 13 feet high (3.96 m) counterweight ring beam for the upper grandstand at Yankee Stadium, New York, NY. Each Gang Form was 15 feet (4.57 m) long. A total if 105 LF (32 m) was furnished.

 

 

 

The use of SCI's 25K (11,340 kg) Wall Brackets eliminated the use of falsework equipment approximately 60 feet (18.3 m) high.

 

 

 

 

Interior Wall or Column Installation
Installation with Adjustable Extension Bracket

 